Home

 

Service
  About Us
  Contact Us
  Products
Engineering

Fire
HVAC
Municipal
Plumbing

  Project Gallery
  Request A Quote
 

Sign Up for a FREE newsletter!

 

 

Engineering : Water Heater Sizing

LOGIN

#1 Type of building

(i.e. hospital, hotel, office building, etc.)

#2 System fixture units

Fixture
 
Type of supply
 
Units
 
Number of fixtures
 
Water Closet flush valve 10
Water Closet flush tank 5
Urinal flush valve 5
Sink (kitchen/bath) faucet 2
Sink (service) faucet 4
Dishwasher automatic 2
Washing machine automatic 4
Hose bib faucet 4
Shower (public) shower head 8
Shower (private) shower head 4
     

#3 Shower Demand

Approximate length of shower usage in minute's

#4 Type of fuel available

(i.e. gas, propane, boiler water)
If steam is used provide PSI of steam to valve
If boiler water is used supply GPM and temperature available
If electric is used supply voltage

#5 Special Requirements




Job Name:


Name:


Company:
Phone :


Fax :


E-mail:


 

 


Home : Service : About : Contact : Products : Engineering : Gallery : Quote

website design & development by:  www.bluelaserdesign.com